Offsite Solutions, the
UK’s leading bathroom pod manufacturer, has been awarded its second contract
for Grainger plc, the UK’s largest listed residential landlord.
This latest project is to manufacture 567 steel-framed bathroom and
shower pods for Exchange Square in Birmingham which is under construction by
main contractor McAleer & Rushe. The pod deliveries to site will begin
towards the end of 2021 and will be completed by summer 2022 as the building’s
structure is constructed.
Exchange Square is developed by Nikal for Grainger plc and will provide 375
homes for rent in a landmark 37-storey tower.
Designed by Stephenson Hamilton Risley Studio, the £68m scheme occupies a
prominent location opposite HS2 Curzon Birmingham. Completion is scheduled for
summer 2023.
The bathroom pods for Exchange Square will have dark grey, large format
porcelain wall and floor tiles with staggered ‘brick bond’ tile joints to the
walls. The bathrooms will be fully fitted in the factory with a three-door
mirrored cabinet, a solid surface vanity shelf, semi-pedestal wall hung basin,
bath with glass hinged shower screen, heated ladder towel rail, and floor mounted
toilet. The shower rooms will have a two-door mirrored wall cabinet and a
sliding shower door.
Commenting on the use of pods, Helena Tsiantes Jansson, Senior Forward Fund Development Manager at
Grainger plc, said, “We fully support the use of offsite manufacturing and for
the bathrooms, it gives us the unique opportunity to check the pods in the
factory before going into full production. This allows us to review the design
detailing and make any minor changes, which is just not possible on site.”
“Following our recent visit to Offsite Solutions’ factory, we were very
impressed with the quality of the finishes, particularly the grouting and
tiling. The quality was spot on and will result in a better quality product for
our residents. Fitting out the bathrooms in a factory which has much more space
and light than on site, definitely impacts positively on quality. It is also
much easier for us to deal with a single supplier for the bathrooms.”
Offsite Solutions is also manufacturing pods for Enigma Square in Milton
Keynes – another Grainger build-to-rent scheme which is under construction by
Bowmer and Kirkland.
Steel-framed bathroom pods give
developers and contractors the opportunity to have a premium aesthetic which
includes porcelain tiling, with all the speed and quality benefits of offsite
manufacture for large-scale residential schemes, hotels and student
accommodation.
These pods have a lightweight steel-framed
construction with a fully tanked wet area to the walls and floor, and a
composite ceiling panel for long-term durability and an enhanced appearance.
Offsite Solutions offers the UK’s
largest range of pods to suit many different building types and applications.
Options include steel-framed bathroom pods with porcelain-tiled finishes for
high-end apartments, PRS, student residences and hotels; robust and low
maintenance GRP composite shower pods for student accommodation, build-to-rent,
care homes, social housing and healthcare; hybrid pods for specialist projects,
and award-winning demountable GRP pods for ease of installation in
refurbishment schemes.
Offsite Solutions has also developed steel-framed utility pods for apartments
or studios for build-to-rent or build-to-sell schemes.
For further information, visit www.offsitesolutions.com, call 01278 780807 or email info@offsitesolutions.com.